Renovation budget: where the money actually goes

by intelia

A renovation budget reads in three blocks: what is invisible, what is seen, and what was not planned. The third often weighs more than expected.

The split helps decide what to protect.

Most of the budget goes into services and finishing work: electrics, plumbing, partitions, floors. Decoration comes last, and contingency must be set aside from the start. A budget with no margin ends with a site stopped halfway.

Three blocks

Services, finishing works, finishes and furniture. Each weighs differently depending on the property’s condition.

  • Services: electrics, plumbing, heating.
  • Finishing works: partitions, floors, paint.
  • Finishes: furniture, lighting, hardware.
  • Contingency, non-negotiable.

What makes budgets slip

Discoveries during the works: ageing wiring, damp, structure. A survey reduces the risk without removing it.

Frequently asked

Should work be prioritised?

Yes: first what cannot be redone without demolishing, then aesthetics.

Can works be phased?

Services are usually cheaper handled in one go.

Order of works and its cost

Services and structure come first because redoing them later means reopening finished walls. Decoration can wait; a closed wall cannot.

  • Survey existing services.
  • Treat damp before finishes.
  • Agree the sequence before quotes.

Can the kitchen come first?

Only if the room’s services are already up to standard.

To frame a budget, send the surface and condition.